Menu
Trending Products
Silica Sand Equipment
Silica Sand Equipment
Photovoltaic sand production line whole plant equipment and solutions
Photovoltaic sand production line whole plant equipment and solutions
Electronic grade high purity silica sand production line project and system
Electronic grade high purity silica sand production line project and system
Silicon sand processing plant and production line for optical communication semiconductor
Silicon sand processing plant and production line for optical communication semiconductor
Artificial stone plate sand production line system and whole plant solution
Artificial stone plate sand production line system and whole plant solution

List of Equipment for Crushing and Magnetic Separation in a 200-Metric-Ton-Per-Day Quartz Sand Purification Plant

Author: ElevateSilica Release time: 2026-11-11 08:32:49 View number: 960

The core of the low-iron quartz sand processing line solution lies in breaking down the “iron reduction and purification” process into controllable steps. For the daily purification of 200 metric tons of quartz sand, selecting the right crushing and magnetic separation equipment is not simply a matter of purchasing a few machines; rather, it requires simultaneously maintaining three key parameters: particle size, magnetic field strength, and water quality.If any one of these is neglected, iron levels cannot be reduced. This article breaks down the equipment configuration by process step to help readers identify gaps in their low-iron quartz sand purification line.

I. The Three Stages of Iron Reduction

The “low iron” in low-iron quartz sand isn\'t achieved by simply running it through a single magnetic separator. Iron reduction and purification consist of three stages: the crushing stage controls the introduction of impurities, the grinding stage controls particle size distribution, and the magnetic separation stage controls the capture of weakly magnetic iron. Only when these three stages are linked together does it constitute a mechanical processing line solution.

A common question in the industry is: “Why can\'t we reduce the iron content even after installing a high-gradient magnetic separator?” The answer often lies in the grinding stage. If the particle size distribution is disrupted, the precision of magnetic separation is directly compromised. For a line with a daily processing capacity of 200 metric tons, the stability of the crushing and grinding stages deserves more attention than that of the magnetic separation section.

低铁石英砂机械线示意图

II. Primary Crushing: Jaw Crusher

A jaw crusher, such as a PE-600×900 or equivalent, is used for primary crushing. The feed size should be controlled within 500 mm, with the discharge size generally ranging from 50 to 100 mm.

The first principle of quartz sand de-ironing and purification is “preventing impurities from entering the process.”If the output size from the primary crusher fluctuates widely, it will disrupt the load on the secondary crusher and grinding processes. Attempting to increase output by widening the discharge opening may result in the secondary cone crusher becoming overloaded, leading to increased liner wear. Best practice is to stabilize the primary crusher output at around 80 mm, leaving some margin for the secondary crusher.

The recommended width for the vibrating feeder is approximately 960 mm; otherwise, large chunks of material will form bridges at the feed inlet, and manually breaking them up can easily damage the liner plates.

III. Secondary Crushing and Shaping: Particle Size Distribution Determines Magnetic Separation Efficiency

Use a cone crusher or horizontal sand-making machine for secondary crushing to reduce 80 mm material to 10–30 mm, while controlling the proportion of acicular and flaky particles. For photovoltaic sand production, feed the material to a trommel screen after secondary crushing to first remove -0.5 mm fine powder and +5 mm coarse particles.

The particle size distribution directly determines the effectiveness of magnetic separation. If the particle size range is too wide, fine particles are easily washed away by the water flow, while coarse particles carry agglomerated iron impurities through the process. After secondary crushing, using a vibrating screen to precisely control the feed size for the grinding mill is a step that is often overlooked in iron reduction and purification.

Skipping the medium crushing stage and using a fine crusher to “get it done in one step” is not advisable.Quartz has a Mohs hardness of 7; forcing a fine crusher to handle it will result in frequent and costly replacement of hammer heads or impact plates. For a line processing 200 metric tons per day, a closed-circuit system using a standard-chamber cone crusher paired with a vibrating screen—where oversize material is returned for re-crushing—is more stable than a “one-step” approach.

中碎与整形设备示意图

IV. Grinding: The Rod Mill Is the Turning Point in Iron Reduction and Purification

For grinding, use a wet rod mill, with the output particle size controlled primarily within the 20 to 140 mesh range—this is the optimal range for photovoltaic sand and low-iron quartz sand. Rod mills use steel rods as grinding media, employing line-contact grinding, which results in less over-grinding compared to ball mills.

In the iron-reduction and purification of quartz sand, the -0.074 mm ultrafine particles are the most difficult to handle; magnetic separation capture efficiency decreases, and fine slime consumes more reagents during acid leaching. The particle shape produced by rod mills tends to be cubic, resulting in good slurry flowability for subsequent magnetic separation and flotation.Replacing the rod mill with a ball mill results in a higher proportion of fine powder, which is unavoidable when producing low-iron sand or photovoltaic sand.

Keep the steel rod filling rate between 40% and 45%, and set the rotational speed to 65% to 70% of the critical speed. If the speed is too high, centrifugal force will fling the rods against the drum wall, actually reducing the grinding efficiency.

V. Primary Magnetic Separation: Removing Mechanical Iron First

For primary magnetic separation, use a CTB permanent magnet drum wet magnetic separator with a drum surface magnetic field strength of approximately 4,000 Gs. Feed the post-grinding slurry directly into the separator to first remove mechanical iron and strongly magnetic minerals introduced during crushing and grinding. Control the slurry concentration between 25% and 35%.

This step is not considered “purification” but rather “cleaning up the site.” Wear on jaw plates and steel rods introduces iron into the feed; this strongly magnetic iron can be removed using a weak-magnetic separator. Skipping the pre-selection step and proceeding directly to high-gradient separation will result in a layer of strongly magnetic iron caking onto the magnetic media, which even rinse water cannot remove.

Preliminary magnetic separation should be performed after grinding; do not reverse the order. The rod mill itself introduces iron into the feed, and another batch is introduced after grinding.

VI. High-Gradient Magnetic Separation: The Core Step in Iron Reduction and Purification

The primary selection should use a vertical ring high-gradient magnetic separator, with a background field strength starting at 1.5 T and, if conditions permit, reaching approximately 1.8 T.The slurry concentration should be between 25% and 35%, and the proportion of particles smaller than -0.074 mm in the feed should not be too high. Strict requirements are placed on iron content; an electromagnetic slurry magnetic separator is subsequently added for scavenging.

Most of the iron in quartz sand exists in a weakly magnetic form—such as hematite, limonite, and iron-bearing inclusions—which ordinary magnetic separators cannot capture.High-gradient magnetic separators are filled with a magnetic stainless steel media grid, which generates localized high magnetic fields to capture fine, weakly magnetic iron particles. If the iron content in the ore is too high, two additional separation stages may be required, or a deep iron removal process can be added downstream. The specific target level depends on the ore conditions and operating parameters; there is no one-size-fits-all figure.

When the slurry concentration exceeds 35%, the slurry becomes viscous, and magnetic particles are carried away by non-magnetic particles, resulting in reduced separation accuracy. The cleaning cycle for the magnetic media must also be closely monitored; if the flushing water pressure is insufficient or the nozzle angle is incorrect, even a high magnetic field strength will be ineffective.

How is a two-stage magnetic separation process superior to a single-stage one? The first stage removes most of the weakly magnetic iron, while the second stage captures residual fine-grained iron from a cleaner slurry.If you try to achieve everything in a single-stage magnetic separation process, you\'ll either have to push the magnetic field strength to its limit—causing power consumption to skyrocket—or slow down the flow rate, resulting in a drop in throughput. For a line processing 200 metric tons per day, a series configuration of two vertical ring separators is typically more cost-effective than a single high-field-strength unit.

There is another option after magnetic separation: replacing acid leaching with flotation. Since the project site imposes strict restrictions on waste acid discharge, acid leaching is not necessarily required after magnetic separation. In the iron-reduction process for quartz sand, magnetic separation provides a baseline, flotation improves quality indicators, and acid leaching serves as a fallback—the specific method is selected based on environmental regulations and the characteristics of the raw ore.For the flotation purification scheme of quartz sand used in photovoltaic glass, neutral-condition flotation can bring iron content within the specifications for photovoltaic sand, resulting in less environmental pressure compared to acid leaching. If the raw ore contains black spots of tourmaline or hornblende, these can be processed simultaneously in the flotation stage. Specific specifications are subject to mineral processing tests.

高梯度磁选与浮选示意图

VII. Dewatering: Ensure the Concentrate Remains Clean in the Final Step

Use ceramic filters or filter presses for dewatering to reduce the moisture content of the concentrate after magnetic separation to a reasonable range; the filtrate should be returned to the front-end grinding or magnetic separation process for reuse. Significant fluctuations in moisture content will cause problems during packaging, transportation, and downstream use.

Using ordinary vacuum filters as a makeshift solution is not recommended. Since quartz sand contains a high proportion of fine particles, the moisture content of the filter cake produced by vacuum filtration tends to be too high. Ceramic filters have low energy consumption, produce clear filtrate, and utilize capillary action to remove water trapped between fine particles.

If the refined sand is to be bagged and shipped directly, a ceramic filter is sufficient; if acid leaching or flotation is required, a filter press produces a drier filter cake, but batch operation involves high labor intensity. For a line processing 200 metric tons per day, continuous operation of a ceramic filter is more reliable.

VIII. Equipment List Quick Reference Table

  • Primary Crushing: PE-600×900 jaw crusher, feed size ≤500 mm, discharge size ≤100 mm

  • Secondary Crushing: Standard-chamber cone crusher in closed-circuit operation with a vibrating screen, discharge size 10–30 mm

  • Grinding: Wet rod mill, with a high proportion of 20–140 mesh particles; steel rod filling rate 40%–45%

  • Primary Concentration: CTB permanent magnet drum magnetic separator, field strength approximately 4,000 Gs, positioned after grinding

  • Main Concentration: Two vertical ring high-gradient magnetic separators connected in series, with a background magnetic field strength starting at 1.5 T

  • Sweep separation (optional): Electromagnetic slurry magnetic separator

  • Deep iron removal (optional): Flotation instead of acid leaching, or acid leaching for purification

  • Dewatering: Ceramic filter (continuous operation) or filter press (drier filter cake, batch operation)

IX. The Three Most Common Pitfalls in Iron Removal and Purification

Uncontrolled Particle Size: A broken screen on the rod mill\'s discharge end goes unnoticed, allowing coarse particles to enter the magnetic separator. Since the spacing of the media mesh is designed based on the feed particle size, once coarse particles get stuck, the separation channel becomes blocked. Check the screen before shutting down each day.

Misrepresented Magnetic Field Strength: Some manufacturers quote “peak” values rather than “background field strength,” resulting in significantly lower actual collection efficiency. When signing a contract, clarify that the specified value refers to the background field strength within the separation chamber, not the peak value at the surface of the magnetic poles.

Uncontrolled Water Quality: If the water used in magnetic separation has high hardness or high levels of suspended solids, the media mesh will become encrusted with scale, and the decline in magnetic field strength will go unnoticed. Install a simple filtration or sedimentation system to remove suspended solids at the inlet.

There\'s another pitfall even earlier in the process: purchasing equipment directly based on a list without conducting mineral processing tests on the ore sample. Whether impurities exist as a surface iron film or are encapsulated within the crystal lattice determines whether magnetic separation, flotation, or calcination and acid leaching is required. The list is for reference only; test reports are the basis for equipment selection, and the quartz sand mineral processing test is a step that cannot be skipped.

选矿试验与工艺设计示意图

X. Staffing and Scope of Delivery

For a daily processing capacity of 200 metric tons, a two-shift operation is reasonable. Each shift should be staffed with one grinding operator, one magnetic separation operator, and one inspector. Since the crushing section handles concentrated feed during the day, the day shift should include an additional operator to monitor the jaw and cone crushers. At least one electrician must be knowledgeable about variable frequency drives (VFDs) and PLCs; otherwise, the magnetic separator parameters cannot be adjusted.

It is unrealistic for a single person to oversee the entire line. Flow rates and concentrations in the magnetic separation stage require constant fine-tuning; if an operator steps away to check the crushing section, the slurry in the magnetic separator will become unbalanced.

Beyond the equipment itself, the division of labor for installation and civil engineering must be clearly defined in advance. A common industry practice is for the supplier to be responsible for core equipment, reagents, and commissioning, while civil engineering and general installation workers are organized locally at the project site, with the supplier dispatching an engineer to provide on-site guidance. This ensures installation standards are met while saving on the cost of dispatching personnel from outside the region. These hidden costs can be just as significant as the equipment costs.

XI. Investment and Performance Metrics

The investment for a low-iron quartz sand processing line depends on the conditions of the raw ore, finished product requirements, site conditions, and the degree of automation. Even for the same daily processing capacity of 200 metric tons, different solutions can result in significant variations in equipment configuration and investment. It is not recommended to apply fixed figures across the board.

The same applies to recovery rates and iron reduction levels. Given variations in the Fe₂O₃ content and grain size distribution of the raw ore, the final reduction level and recovery rate can only be determined after completing mineral processing tests. Guessing figures is far less reliable than test reports specific to your own ore.

The standard practice is to offset the costs of preliminary mineral processing tests and process design against the equipment payment when signing the subsequent equipment or complete-line contract. It is far more cost-effective to spend a small amount upfront to fully understand the ore than to discover halfway through construction that the process route is incorrect and have to make changes.

XII. Concluding Remarks

The core logic of a mechanical processing line for low-iron quartz sand is as follows: prioritize stability in the crushing stage, uniformity in the grinding stage, purity in the magnetic separation stage, and dryness in the dewatering stage. Each of these four stages should focus on its own objectives without compromising on quality for the sake of the others.

This list of crushing and magnetic separation equipment for a 200-metric-ton-per-day quartz sand purification line is provided for reference when comparing proposals and should not be applied directly. Different ores require different lines. Equipment selection for a low-iron quartz sand purification line must always be based on test data from the raw ore.

If you have specific raw ore parameters, such as Fe₂O₃ content and particle size distribution, please send them to us so we can first review the equipment selection and the iron-reduction and purification process flow. Let\'s review the plan first, then discuss the equipment.

Inquiries and Collaboration: If you need further information on low-iron quartz sand processing line solutions or tailored equipment configuration recommendations, please submit your raw ore report (Fe₂O₃ content, particle size distribution, and impurity characteristics) along with your finished product requirements.We will first conduct mineral processing test evaluations, then provide recommendations on the process flow as well as the selection of quartz sand magnetic separation and crushing equipment to ensure the solution aligns with the conditions of the raw ore.

Category
Inquiry and Quotation
Nginx server needs to configure pseudo-static rules, click View configuration method